Transport Planning, Add a warning if the Load date is before Planned produced date
Last modified by Oskar Kristinsson on 2025/11/18 11:48
A warning has been introduced to prevent adding an element to a stack or transport when the load and delivery date precede the element’s production date.

This warning will appear under the following operations when the above condition is met:
- Auto Transport
- Add to Transport / Insert
- Cut & Paste Transport
- Drag & Drop Transport
- Add Stack
- Insert Element Stack
- Cut & Paste Stack
- Drag & Drop Stack
- Drag & Drop Cast (only when a stack is dragged into the Cast detailed view)