Compressed Stack Planning
Introduction
The Compressed stack planning report contains information about the stack id, stack no, element mark, length, mass, height, etc.
Report Setup
General report setup. All the fields have to be filled if you need a sum row at the end of the page.
Page max X and Page max Y defined the maximum size of the report page.
The X-axis is the columns A, B, C etc. The Y-axis is the rows 1, 2, 3 etc.
Continuous Header Row defines in which row the header and footer start, and in this case, it starts from row 5.
Continuous Start Row (in this case from row 5) is where the main information starts and Continuous End Row should be 0.
Note: In this report, it is important that Page max Y is set to 0 and also Continous End and Sum.
Header setup:
Here is how the header is set up for this report.
As you can see we have different X and Y values for each field. This is done so the program knows where to put the specific information into the report.
In this report, you can give the header a name.
Here are the fields that can be added to the Header and Footer:
Note: This report is not made for merged cells so take that into consideration when placing the QR code, the QR code takes 3 cells and should be inserted into the top cell.
Fields | Description |
PROJECT | |
PROJECT_NAME | |
QR_CODE | |
STACK_DESCRIPTION | |
STACK_ID | |
STACK_NO | |
STACK_TYPE | |
TOTAL_ELEMENT_MASS | |
TOTAL_STACK_MASS |
Continuous setup:
The Continuous setup is where you set up all the information, in this case, about the Cast Order.
As you can see, here you define only one row because this row will be the basis for this report, from row 5.
The fields you can add to this section are listed below:
Fields | Description |
DIVISION | |
ELEMENT_ID | |
ELEMENT_MARK | |
FACTORY | |
HEIGHT | |
LENGHT | |
MASS | |
PROJECT | |
STACK_LAYER_NO | |
STACK_SEQUENCE_NO | |
TOTAL_HEIGHT | |
TOTAL_LENGTH | |
TOTAL_WIDTH | |
WIDTH |
Print report
From the cast module in Resource Manager and Project Manager