Planned Production

Last modified by Dennis Knudsen on 2023/05/22 11:35

Introduction

The Planned Production report contains information about date, project, elementmark, castbed and etc.

Planned Production report that can be printed from Cast planning module in Project Manager and Resource Manager

Report Setup

General report setup. All the fields have to be filled if you need a sum row at the end of the page.

1.png

Page max X and Page max Y defined the maximum size of the report page.
The X-axis is the columns A, B, C etc. The Y-axis is the rows 1, 2, 3 etc.

Continuous Header Row defines in which row the header and footer start, and in this case, it starts from row 9.

Continuous Start Row (in this case from row 10) is where the main information starts and Continuous End Row (in this case until row 30) is where the main information ends.
If the last field is filled a summary for each page will be created at the end of the page.

Header setup: 

Here is how the header is set up for this report.

2.png

As you can see we have different X and Y values for each field. This is done so the program knows where to put the specific information into the report.

As mention above, the continuous header starts at row 9 to row 9 in the Y direction.

Here are the fields that can be added to the Header and Footer:

FieldsDescription
DIVISION 
FACTORY 
REPORT_PAGE_NUMBER 
REPORT_PRINT_DATE 
START_DATE 
USER_DIVISION_CITY 
USER_DIVISION_COUNTRY 
USER_DIVISION_DESCRIPTION 
USER_DIVISION_FAX 
USER_DIVISION_NAME 
USER_DIVISION_PHONE 
USER_DIVISION_STREET 
USER_DIVISION_ZIPCODE 
USER_MOBILE 
USER_NAME 
USER_PHONE 
USER_SIGNATURE 
USER_TITLE 

Selection setup:
The standard setup for the selections.

Continuous setup:

 The Continuous setup is where you set up all the information, in this case, about the Planned Production.

3.png

As you can see, here you define only one row because this row will be the basis for this report, from row 10 to 30 as shown further up. 

BED_ROTATION 
BED_X 
BED_Y 
BOUNDING_BOX_AREA 
CAST_ID 
CAST_NOTE(New in Q2/2023)
CAST_UNIT_DESCRIPTION(New in Q2/2023)
CAST_UNIT_NAME 
COST 
ELEMENT_BUILDING 
ELEMENT_FLOOR 
ELEMENT_ID 
ELEMENT_MARK 
ELEMENT_NOTE 
ELEMENT_NOTE2(New in Q2/2023)
ELEMENT_NOTE3(New in Q2/2023)
ELEMENT_NOTE4(New in Q2/2023)
ELEMENT_PHASE 
ELEMENT_PROJECT 
ELEMENT_TYPE 
GROSS_AREA 
HEIGHT 
LENGTH 
MASS 
MAX_DRAWING_REVISION(New in Q1/2023)
NET_AREA 
NUMBER_OF_ELEMENTS 
PRODUCT 
PRODUCTION_DATE 
PROJECT_DESCRIPTION 
PROJECT_NAME 
REMARK 
STACK_ID 
STACK_LAYER_NO 
STACK_SEQUENCE_NO 
STYLE 
TIME 
VOLUME 
WIDTH 

Print report

From Transport Planning
This report can be printed from the Cast planning module which can be found in Project Manager and Resource Manager as shown below.

You right-click on one or several cast beds, select print, and then either "production per day" or "production over period".

4.png

Example

5.png

Download

You can download the report template here