Project Follow-Up
Introduction
The report summarises the whole project.
Report Setup
General report setup. All the fields have to be filled in for the sum row at the end of each page to print.
Page max X and Page max Y defined the maximum size of the report page.
The x-axis is the columns A, B, C, and etc. and the Y-axis is the rows 1, 2, 3, and etc.
Continuous Header is defined in which row the header and footer start, and in this case, it starts from row 10.
Continuous start row (in this case it is row 12) is where the main info starts and ends in the Continuous end row(in this case it is row 0)
There is no summary for this report.
Header setup:
Here is how the header is set up for this report.
As you can see we have those x and y values for each field, so the program knows where to put the specific information into the report.
As mentioned above, the Continuous header starts at row 10 to row 0 in the Y direction.
Here are the fields that can be added to the Header and footer:
Fields | Description |
BUILDING | |
DIVISION | |
FACTORY | |
FLOOR | |
PHASE | |
PROJECT | |
PROJECT_SUMMARY | |
PROJECT_TRIMED | |
REPORT_NAME | |
REPORT_PAGE_NUMBER | |
REPORT_PRINT_DATE | |
REPORT_REVISION | |
REPORT_REVISION_DATE | |
REPORT_TITLE | |
SELECTION_PRODUCT | |
USER_DIVISION_CITY | |
USER_DIVISION_COUNTRY | |
USER_DIVISION_DESCRIPTION | |
USER_DIVISION_FAX | |
USER_DIVISION_NAME | |
USER_DIVISION_PHONE | |
USER_DIVISION_STREET | |
USER_DIVISION_ZIPCODE | |
USER_MOBILE | |
USER_NAME | |
USER_PHONE | |
USER_SIGNATURE | |
USER_TITLE |
Continuous setup:
Here in Continuous setup is where you set up all the information about holes in this case.
As you can see, here you define only one row because this row will be the bases for this report, from row 12 to 0 like shown further up.
The fields you can add to this section are listed below.
Fields | Description |
BEND_RC | |
BEND_RC_MESH | |
BOUNDING_BOX_AREA | |
BUILDING | |
CAST_IS_REPORTED | (New in Q2/2023) |
CAST_REPORTED_COST | (New in Q2/2023) |
CAST_REPORTED_DATE | (New in Q2/2023) |
COST_PR_SQUAREMETER | |
DELIVERY_DATE | |
DOORS | |
ELEMENT_GROUP | |
ELEMENT_ID | |
ELEMENT_MARK | |
ELEMENT_TYPE | |
EXPOSURE_CLASS_1 | (New in Q3/2024) |
EXPOSURE_CLASS_2 | (New in Q3/2024) |
EXTENSION_BACK | |
EXTENSION_BOTTOM | |
EXTENSION_FRONT | |
EXTENSION_LEFT | |
EXTENSION_RIGHT | |
EXTENSION_TOP | |
FACTORY | |
FLOOR | |
GROSS_AREA | |
HEIGHT | |
HOLES_LARGE | |
HOLES_MEDIUM | |
HOLES_SMALL | |
INSULATION_AREA | |
INSULATION_MATERIAL | |
INSULATION_THICKNESS | |
INSULATION_VOLUME | |
LENGTH | |
MASS | |
NET_AREA | |
NOTES | |
NOTE2 | (New in Q2/2023) |
NOTE3 | (New in Q2/2023) |
NOTE4 | (New in Q2/2023) |
PHASE | |
PLANNED_DELIVERY_DATE | |
PLANNED_DRAWING_DATE | |
PLANNED_ERECTION_DATE | |
PLANNED_PRODUCTION_DATE | |
PRODUCT | |
PRODUCTION_DATE | |
PRODUCTION_FACTORY_NAME | |
PROJECT | |
REINFORCEMENT_GROUP | |
REINFORCEMENT_MESH | |
STATUS | |
STRAIGHT_RC | |
STRAND_DIAMETER | |
STRAND_LENGTH | |
TOTAL_CONCRETE_VOLUME | (New in Q2/2023) |
TOTAL_COST | |
TOTAL_HEIGHT | |
TOTAL_LENGTH | |
TOTAL_TIME | |
TOTAL_WIDTH | |
TRANSPORT_ID | |
VOLUME_INNER_PANEL | (New in Q2/2023) |
VOLUME_OUTER_PANEL | (New in Q2/2023) |
W_CIM_TABLE | |
WIDTH | |
WINDOWS |
Print report
From Report Tool
It is possible to make the normal selection on what to print, based on the information you want to get out of the report.
You also have the option to save your selection.
From Resource Manager
Planning -> Right-click -> Print -> Element follow up (Same as Project Follow-Up)