Reinforcement Bending Schedule Summary

Last modified by Adam Carlson on 2021/09/20 14:53

Introduction

This report summarises the bent reinforcement in the project based on each element mark

This is both a production and design report that can be printed from Report Tool and Project Manager Cast Planning.

Report Setup

General report setup. All the fields have to be filled if you want a summary row at the end of each page.

1.png

Page max X and Page max Y defined the maximum size of the report page.
The X-axis is the columns A, B, C etc. The Y-axis is the rows 1, 2, 3 etc.

Continuous Header Row defines in which row the header and footer start, and in this case, it starts from row 0.

Continuous Start Row (in this case from row 11) is where the main information starts and Continuous End Row (in this case until row 40) is where the main information ends.
If the last filed would be filled a summary for each page would be created at the end of the page.

Header setup: 
Here is how the header is set up for this report.

2.png

As you can see we have different X and Y values for each field. This is done so the program knows where to put in the specific information into the report.

As mention above, the continuous header starts at row 0 to row 10 in the Y direction.

Here are the fields that can be added to the Header and Footer:

FieldsDescription
BUILDING 
DIVISION 
FACTORY 
FORM 
PHASE 
PROJECT 
PROJECT_SUMMARY 
PROJECT_TRIMED 
REPORT_DATE 
REPORT_NAME 
REPORT_PAGE_NUMBER 
REPORT_PRINT_DATE 
REPORT_REVISION 
REPORT_REVISION_DATE 
REPORT_TITLE 
REPORT_USERNAME 
SELECTION_PRODUCT 
START_DATE 
USER_DIVISION_CITY 
USER_DIVISION_COUNTRY 
USER_DIVISION_DESCRIPTION 
USER_DIVISION_FAX 
USER_DIVISION_NAME 
USER_DIVISION_PHONE 
USER_DIVISION_STREET 
USER_DIVISION_ZIPCODE 
USER_MOBILE 
USER_NAME 
USER_PHONE 
USER_SIGNATURE 
USER_TITLE 

Selection setup:
The standard setup for the selections.

Continuous setup:

The Continuous setup is where you set up all the information, in this case, about the bent reinforcement.

3.png

As you can see, here you define only one row because this row will be the bases for this report, from row 11 to 40 like shown further up. 

The fields you can add to this section are listed below.

FieldsDescription
CUTLENGTH 
CUTLENGTH_ROUNDED 
DIAMETER 
END_1 
END_2 
END_DIRECTION_1 
END_DIRECTION_2 
JIG_RADIUS 
MASS 
MEASURE_A 
MEASURE_B 
MEASURE_C 
MEASURE_D 
MEASURE_E 
MEASURE_F 
MEASURE_G 
MEASURE_R 
MEASURE_S 
MEASURE_T 
MEASURE_U 
MEASURE_V 
MEASURE_W 
MEASURE_X 
MEASURE_Y 
QUALITY 
RC_NAME 
REMARK 
REVISION 
SHAPE_CODE 
SHAPE_PICTURE 
SUM 

Print report

From Report Tool
It is possible to make the normal selection on what to print, based on the information you want to get out of the report.

You also have the option to save your selection.

4.png

When clicking on "Print" you will be prompt with the option to create the path for the report. Select yes and the report will be created and stored under the project folder.

createdocpath.png

If you add elements or change anything in the project and print the report again, the report will make a new file and store the difference in the new file, so that you can see what has been changed in the project.

Example

5.png

Download

You can download the report template here