Cast Stack Planning

Last modified by Dennis Knudsen on 2023/08/23 15:44

Introduction

The Cast Stack Planning report contains information about the transport number, stack id, project, element mark, length, weight, height, area, volume etc. 

Production report that can be printed from the Cast Planning (Calendar, Detailed view, and Cast).

Report setup

General report setup: 
All the fields have to be filled as it prints a sum row at the end of each page.

1h.png

Page max X and Page max Y defined the maximum size of the report page.
The X-axis is the columns A, B, C etc. The Y-axis is the rows 1, 2, 3 etc.

Continuous Header Row defines in which row the header and footer start, and in this case, it starts from row 5.

Continuous Start Row (in this case from row 6) is where the main information starts and Continuous End Row (in this case until row 0) is where the main information ends.
If the last filed is filled a summary for each page will be created at the end of the page.

 

Header setup: 
Here is how the header is set up for this report.

2h.png

As you can see we have different X and Y values for each field. This is done so the program knows where to put the specific information into the report.

As mention above, the continuous header starts at row 5 to row 5 in the Y direction.

Here are the fields that can be added to the Header and Footer:

FieldsDescription
DIVISION_NAME 
FACTORY 
REPORT_PAGE_NUMBER 
REPORT_PRINT_DATE 
USER_DIVISION_CITY 
USER_DIVISION_COUTRY 
USER_DIVISION_DESCRIPTION 
USER_DIVISION_FAX 
USER_DIVISION_NAME 
USER_DIVISION_PHONE 
USER_DIVISION_STREET 
USER_DIVISION_ZIPCODE 
USER_MOBIL 
USER_NAME 
USER_PHONE 
USER_SIGNATURE 
USER_TITLE 

Selection setup:
The standard setup for the selections.
 

Continuous setup:

The Continuous setup is where you set up all the information, in this case, about the Cast Stack Planning.

3h.png

As you can see, here you define only one row because this row will be the basis for this report, from row 6 to 0 as shown further up. 

The fields you can add to this section are listed below

FieldsDescription
BED_ROTATION 
BED_X 
BED_Y 
BOUNDING_BOX_AREA 
CAST_ID 
CAST_NOTE(New in Q2/2023)
CAST_UNIT_NAME 
COST 
COVER_BOTTOM 
ELEMENT_BUILDING 
ELEMENT_FLOOR 
ELEMENT_ID 
ELEMENT_MARK 
ELEMENT_PHASE 
ELEMENT_PROJECT 
ELEMENT_TYPE 
EXTENSION_BACK 
EXTENSION_BOTTOM 
EXTENSION_FRONT 
EXTENSION_LEFT 
EXTENSION_RIGHT 
EXTENSION_TOP 
FORM 
FORMSEQUENCENO 
FORMSLAB_PRIMARY_RC_DIM_SPACING 
FORMSLAB_SECONDARY_RC_DIM_SPACING 
GROSS_AREA 
HEIGHT 
LENGTH 
MASS 
MATERIAL 
MATERIAL_FIRST_LAYER 
MATERIAL_SECOND_LAYER 
MATERIAL_THIRD_LAYER 
MAX_PRESTRESSING 
MESH_AREA_WALL 
MESH_DESCRIPTION 
MESH_DESCRIPTION_WALL 
MESH_NAME 
MESH_NAME_WALL 
NET_AREA 
NO_OF_STRANDS_DESIGN 
NO_OF_STRANDS_PRODUCTION 
NOTE 
NOTE2(New in Q2/2023)
NOTE3(New in Q2/2023)
NOTE4(New in Q2/2023)
NUMBER_OF_ELEMENTS 
PRIMARY_RC 
PRODUCT 
PRODUCTION_DATE 
PRODUCTION_DESCRIPTION 
PROJECT_NAME 
PROJECT_TEXT_3 
REMARK 
SECONDARY_RC 
SHIFT 
STACK_ELEMENT_COUNT 
STACK_ID 
STACK_LAYER_NO 
STACK_NO 
STACK_SEQUENCE_NO 
STORAGE_LOCATION 
STRANDPTN_CONTINOUS 
STYLE 
TIME 
TOTAL_HEIGHT 
TOTAL_LENGTH 
TOTAL_WIDTH 
TRANSPORT_ID 
TRANSPORT_NO 
VOLUME 
WIDTH 

Print report

From Cast Planning
This report can be printed from the Project Manager as shown here as well as from the Resource Manager.

You right-click on a cast and select print "Cast Stack Planning"

4h.png

Example

5h.png

Download

You can download the report template here