Transport Label

Last modified by Dennis Knudsen on 2023/05/16 14:44

Introduction

The transport label report contains information about the QR-code and transport number. 

Production report that can be printed from the Transport Label.

Report Setup

General report setup. All the fields have to be filled if you need a sum row at the end of the page.

1t.png

Page max X and Page max Y defined the maximum size of the report page.
The X-axis is the columns A, B, C etc. The Y-axis is the rows 1, 2, 3 etc.

Continuous Header Row defines in which row the header and footer start, and in this case, it starts from row 10.

Continuous Start Row (in this case from row 11) is where the main information starts and Continuous End Row (in this case until row 40) is where the main information ends.
If the last field is filled a summary for each page will be created at the end of the page.

Header setup: 

Here is how the header is set up for this report.

2t.png

As you can see we have different X and Y values for each field. This is done so the program knows where to put the specific information into the report.

As mention above, the continuous header starts at row 10 to row 10 in the Y direction.

Here are the fields that can be added to the Header and Footer:

FieldsDescription
ADDRESS_TABLE 
BUILDING_OWNER_CITY 
BUILDING_OWNER_NAME 
BUILDING_OWNER_STREET 
BUILDING_OWNER_ZIPCODE 
BUILDING_SITE_CITY 
BUILDING_SITE_NAME 
BUILDING_SITE_STREET 
BUILDING_SITE_ZIPCODE 
CONTACT_EMAILADRESS 
CONTACT_FIRSTNAME 
CONTACT_LASTNAME 
CONTACT_MIDDLENAME 
CONTACT_NAME 
CONTACT_PHONE1 
CONTACT_PHONE2 
CONTACT_PHONE3 
CONTACT_TABLE 
CONTACT_TITLE 
LOADING_DURATION 

MAX_ELEMENT_HEIGHT

(New in Q2/2023)

MAX_ELEMENT_LENGTH

(New in Q2/2023)

MAX_ELEMENT_WIDTH

(New in Q2/2023)
UNLOADING_DURATION 

Selection setup:
The standard setup for the selections.

Continuous setup:

No Continuous setup for this type of report.

Print report

From Transport Planning
This report can be printed from the Project Manager as shown here and also from the Resource Manager.

You right-click on a transport and select print "Transport Label"

3.png

Example

3t.png

Download

You can download the report template here