Settings I

Version 22.1 by KristoferHellman on 2019/02/07 14:47

IMPACT Resource Manager settings are vital in setting up and maintaining the company production settings and environment. Settings are divided into two section (see figure 1).

1549547078701-712.png

Figure 1, Settings I and Settings II for the Resource Manager

The settings tab in the resource manager contains five separate tabs.

  • Properties
  • Invoice Address
  • Cost Estimation
  • Pallet
  • Automation

Properties

IMPACT Resource Manager  - Settings_html_6def9ccc.png

Figure 2, Resource Manager main settings

Properties tab

Under the properties tab, there are four settings

  • General
  • Transport
  • Stack
  • Cast

Under the general tab, there are six possible settings:

  • Company Name
  • Date Format
  • Message Log Life Time
  • Drawing Planning
    • Set to Yes if you don’t want to allow users to set an element as ready for production when the drawing is still preliminary.
  • Open Drawings
    • Set to no if you don’t want the user to be able to open drawings from the Cast and Transport modules, otherwise; select the formats to be made available.
  • Company Range Separator
    • Specifies the separator that is to be used for element range searches.

IMPACT Resource Manager  - Settings_html_7820a20b.png

Figure 3, Settings – Properties – General tab

Under the transport tab, there are five settings (also see figure 4):

  • Delivery Planning
    • Set to ‘Yes’ in order to disable the users from settings the delivery time in the element ID grid
  • Match Transport Factory
    • Set to Yes if notify the user that they have planned transport at a factory different factory than manufacturing
  • Can Reverse Transport Status
    • Set to No to disable the user from reverse transport status
  • Max Transport Rows
    •  
  • Initialized Text Fields
    • Set to Yes if you want a to have field 1-4 in the next planned transport to be copied from the previously planned transport.

IMPACT Resource Manager  - Settings_html_m6abce80d.png

Figure 4, Settings – Properties – Transport tab

Under the Stack tab, there are two settings (also see figure 5):

  • Default Stack Status
    • Sets the default status of a stack, set to Preliminary or planned
  • Can Reverse Stack Status
    • Provides a possibility to disable the user from reversing the status of a stack, set to No to do so.

IMPACT Resource Manager  - Settings_html_dc4474f.png

Figure 5, Settings – Properties – Stack tab

Under the Cast tab, there are eight settings (also see figure 6):

  • Production Planning
    • Set to yes to disable the user from setting the production date in in the element ID grid. This also requires an element to be in status-type produced in order for the user to set it as delivered.
  • No of Cast Report Pictures
    • The Number of pictures that the form is divided into when printing a cast report with pictures.

And then there are the Mandatory Cast Planning Conditions settings:

  • Sales Project Name
    • Set to yes if cast/element status set to produced in not allowed
  • Price
    • Set to yes if cast/element status produced is to be disabled if element price is missing
  • Time
    • Set to yes if cast/element status produced is to be disabled if element time is missing
  • Mass
    • Set to yes if cast/element status produced is to be disabled if element mass is missing
  • Area
    • Set to yes if cast/element status produced is to be disabled if element area is missing
  • Group
    • Set to yes if cast/element status produced is to be disabled if element group is missing

IMPACT Resource Manager  - Settings_html_m3e6a58ac.png

Figure 6, Settings – Properties – Cast tab

(Invoice Address)

Cost Estimation

Under the Cost Estimation tab, there are four settings (see figure 7). There are four settings:

  • Currency Symbol (for e.g. kr for Swedish Krona)
  • Framework and Form Time
    • Recesses Without Name
    • Not Cut Through Recesses
    • Recesses Area Less Than 0.1 m2
    • Group By

IMPACT Resource Manager  - Settings_html_6df929f4.png

Figure 7, Settings – Cost Estimation

Pallet

Under the Pallet tab (see figure 8), there are two settings:

  • Production Stack Count
  • Production Stack Size

IMPACT Resource Manager  - Settings_html_m28df818a.png

Figure 8, Settings – Pallet

Automation

Under the automation tab (see figure 9), there are four drop-downs:

  • BVBS Settings
    • Save File Location
    • Subfolder
    • Drawing Number
    • Naming of files
  • PXML Settings
    • Save File Location
    • Subfolder
    • Drawing Number
    • Naming of Files
  • Unitechnik Settings
    • Original File Location
    • Save File Location
  • AX Settings
    • Save File Location

IMPACT Resource Manager  - Settings_html_62f10534.png

Figure 9, Settings – Automation

Another part of the settings is in the tree view, this is described under the section Settings II.

Tags:
Copyright 2024 StruSoft AB
IMPACT Wiki