Settings II

Version 28.1 by KristoferHellman on 2019/02/12 16:27

IMPACT Resource Manager settings are vital in setting up and maintaining the company production settings and environment. Settings are divided into two sections, this is section II. In this section, the tree view settings are described, see figure 1 for the tree view.

1549547604001-526.png

Figure 1, Project Manager settings tree view

There are 15 different possible selections in the tree view, and they are hereby presented one at a time.

Addresses

Addresses present an overview of the stored addresses in the system. This is where the address administrator can add and delete addresses, see figure 1.

1549548316045-666.png

Figure 1, Addresses

There are two major parts of this view, a filter and a presentation of the filtered addresses. The filter options are:

  • Name
  • Type
    • Delivery Address
    • Shipper
    • Consignee
    • Other
    • <All>
  • Description
  • Country
  • City
  • Street

When not using the options in the filter, all addresses will be displayed after pressing the refresh button.

Agents

Agents present an overview of the available agents in the system, see figure 2.

1549548921903-500.png

Figure 2, Agents

The agents view contains two major parts, the filter, and the agents view. The filter options are:

  • Name
  • Type
    • Transport Company
    • Driver
    • Contact
    • Other
    • <All>
  • Personnr
  • First Name
  • Last Name

When not using the options in the filter, all agents will be displayed after pressing the refresh button.

Working Calendar

The Working Calendar contains two major parts, Working Days and Invalid Days for each Division, please see figure 3.

1549550354179-910.png

Figure 3, The Working Calendar

In the working calendar, working days and holidays can be specified. There are two kinds of days for the calendar:

  • Working Days
    • Days when the selected Division is up and running, weekends may be specified as a holiday (day-off)
  • Invalid Days
    • Days where the selected Division is either on holiday (day-off) or working

The settings made in the working calendar are made by Division and therefore must be set for each division separately. The settings made here influence the cast calendar and the setup will be visible when doing cast planning.

Factories

In Factories, each production factory is added and thereby assigned a Production Factory id, see figure 4.

1549551734224-887.png

Figure 4, Production Factories

Here, the following fields are available for each factory:

  • Name
  • External Name
  • Main Address
  • Pickup Address
  • Invoice Address
  • CE Code
  • Transport Code
  • Tran Gan Code
  • Text1
  • Text2
  • Text3
  • Text4
  • Description
  • Production Factory Id

After adding a factory with the "+"-button, the fields may be edited.

Divisions

The Divisions section is where production divisions are added, see figure 5.

1549552732876-510.png

Figure 5, Production Divisions

When a new production division is added, it is given a unique division id. Add a division by pressing the "+"-button. Each division contains the following fields:

  • Name
  • Division Type
    • Production
    • Transport
    • Other
  • Factory
  • Manager
  • Address
  • Description
  • Division Id

The set field data is then saved by pressing the "Save Changes"-button that appears after the creation of a new division.

Divisions also contain the possibility to add the number of hours available during a time period and the number of active working shifts during this period, see figure 6. Especially take note of the Production Date filter, this can be used to plan and view specific time periods.

1549566662583-245.png

Figure 6, Divisions time and shift specification (left), Division user administration (right)

Adding a third shift with 160 allocatable work hours during a five day period can be accomplished by right clicking in the Available Times window, see figure 7 and 8.

1549567093766-698.png

Figure 7, adding a new shift, new

1549567151399-757.png

Figure 8, adding a new shift, creating newly available times

Cast Units

Cast Units is where cast units are added to a specific production Division, hence, before creating cast units, a production division must be created.

1549568416406-884.png

Figure 9, Cast Units, note that a division is selected

There are three different types of cast units:

  • Bed
  • Table
  • Pallet

If the factory is using strand reinforcement, the bed strand type is to be changed from Standard to Bed, please see figure 10.

1549980315873-207.png

Figure 10, Cast Units, Strand Type set to Bed and five strands added

The strands have the following settings:

  • Used (check or unchecked)
  • Position (1, 2, ..., n)
  • X (X-coordinate)
  • Y (Y-coordinate)
  • Dimension (stand diameter in milimeters)
  • Quality
  • Prestressing (MPa)

Element Groups

Storages

Stack Template

Transport Vehicle

Transport Template

Transport Cost

Number Generator

Status

Message Log

 

 