Rejected Elements
Introduction
This report shows the rejected elements in one or multiple projects, all defined in the search ribbon in the Resource Manager.
Report Setup
General report setup. All the fields have to be filled if you need a sum row at the end of the page.
Page max X and Page max Y defined the maximum size of the report page.
The X-axis is the columns A, B, C etc. The Y-axis is the rows 1, 2, 3 etc.
Continuous Header Row defines in which row the header and footer start, and in this case, it starts from row 6.
Continuous Start Row (in this case from row 8) is where the main information starts and Continuous End Row (in this case until row 27) is where the main information ends.
If the last field is filled a summary for each page will be created at the end of the page.
Header setup:
Here is how the header is set up for this report.
As you can see we have different X and Y values for each field. This is done so the program knows where to put the specific information into the report.
As mention above, the continuous header starts at row 6 to row 7 in the Y direction.
Here are the fields that can be added to the Header and Footer:
Fields | Description |
REPORT_PAGE_NUMBER | |
REPORT_PRINT_DATE | |
USER_DIVISION_CITY | |
USER_DIVISION_COUNTRY | |
USER_DIVISION_DESCRIPTION | |
USER_DIVISION_FAX | |
USER_DIVISION_NAME | |
USER_DIVISION_PHONE | |
USER_DIVISION_STREET | |
USER_DIVISION_ZIPCODE | |
USER_MOBILE | |
USER_NAME | |
USER_PHONE | |
USER_SIGNATURE | |
USER_TITLE |
Selection setup:
The standard setup for the selections.
Continuous setup:
The Continuous setup is where you set up all the information, in this case, about the Disorder Issue.
As you can see, here you define only one row because this row will be the basis for this report, from row 8 to 27 as shown further up.
The fields you can add to this section are listed below
BUILDING | |
CAST_STATUS_TIME | (New in Q1/2023) |
CAST_UNIT | |
CATEGORY | |
CHECKED_BY | |
COST_CALC_ID | |
DESIGNED_BY | |
DIVISION_NAME | |
ELEMENT_ID | |
ELEMENT_MARK | |
ELEMENT_TYPE | |
ERRAND_CHANGED_BY | |
ERRAND_CHANGED_DATE | |
ERRAND_COST | |
ERRAND_CREATED_BY | |
ERRAND_CREATED_DATE | |
ERRAND_CURRENCY | |
ERRAND_DEAD_LINE | |
ERRAND_DESCRIPTION | |
ERRAND_ID | |
ERRAND_ISREPORTED_1 | |
ERRAND_ISREPORTED_2 | |
ERRAND_NAME | |
ERRAND_ORIGIN | |
ERRAND_OWNER | |
ERRAND_PRIORITY | |
ERRAND_REASON | |
ERRAND_SOLUTION | |
ERRAND_SOLUTION_TYPE | |
ERRAND_STATUS | |
ERRAND_TIME | |
FACTORY_NAME | |
FLOOR | |
P_ATTACHMENTS | (New in Q2/2023) - Each Attachment will be placed in a cell. The Cell size determines the size of the Attachment. The minimum cell size for PDFs is height = 0,75* and width = 1*. |
PHASE | |
PROJECT | |
PROJECT_DESCRIPTION | |
PROJECT_NAME | |
REASON | |
RELEATE_ERRAND_ID | |
SHIFT | |
STANDARD | |
SUBREASON | |
TOTAL_COST | |
TOTAL_TIME |
Print report
From Resource Manager
This report can be printed from the Resource Managers Rejection tab.
You have the option to print selected rejections or all
From Project Manager
This report can be printed from the Project Manager.
You right-click on disorders in the home tab and select print.