Cost Calculation Method
Version 3.1 by Fredrik Arheden on 2018/12/07 15:23
The user is able to set how to calculate the elements costs in every project. The option called "Cost based on fixed priced" do not need any detailed configuration i the settings tab.
This option is set on project level and can be found under "Project -> Settings -> Cost Method".
Figure 1: Cost Method - Cost based on fixed prices