Release notes IMPACT for Project Manager 16.0.022

Last modified by Dennis Knudsen on 2021/06/08 08:22

New

New: Update to SBE Element Mark to XML export. (Case 101449)
New: Transport Factory & Cast Division added to element colors. (Case 64310)
New: Possibility to Import ”Planned drawing date”, ”Planned production date” and ”Planned Erection Date" as optional from Excel. (Case 103385)
New: Phase Export added to the Simplanner export. (Case 89704)
New: Layout support for 3D, Floor plan & Elevation. (Case 103852)
New: Keep Produciton code for openings when importing a project. (Case 102087)
New: It is now possible to import CIM, Recess, and Reinforcement through the Excel Linked Element mark import. (Case 100297)
New: ERP Export JSON to SYSCO. (Case 100870)
New: Element Tag color added. (Case 47404)
New: Confirmation on deleting plot templates added. (Case 100827)
New: Automatically Synchronize the copied files for file sync projects. (Case 99787)
New: Added Truck no, Stack no and Stack sequence to PCP export 1.3. (Case 102230)
New: Add articles for thickness of concrete layer for DoubleWalls and FormSlab in the SBE Element Mark to XML. (Case 101189)
New: Add articles depending on Element Group the to the TB XML to erpbos export. (Case 103173)

Fix

Fix: where recess in slabs wher not shown correctly in PMs model viewer. (Case 100378)
Fix: Unlock on open drawing. (Case 99420)
Fix: Unhide elements causes the model to disappear. (Case 99507)
Fix: The Approved date in Project Manager shows -1 day when set. (Case 100178)
Fix: Text color in model do not update automatically if elements are added/removed from cast. (Case 49557)
Fix: Special case where the File sync wouldn't sync the files. (Case 100768)
Fix: Special case where the endcap openings weren't shown correctly in the model view. (Case 102121)
Fix: Special case where elements were shown mirrored in PM compared to Autocad. (Case 102922)
Fix: Special case where copy project gave an error. (Case 103580)
Fix: Special case where a project import gave an error. (Case 103592)
Fix: Special case where "Show in folder" opened the user's documents. (Case 100108)
Fix: Resolved an issue where the full name of the drawing was not displayed when running the Batch generate command. (Case 99985)
Fix: Recess missing for slabs in model viewer. (Case 98971)
Fix: Planned Drawing date is not filled in element mark grid. (Case 100995)
Fix: Phases, Show/Hide and Model/Element IDs are having issues. (Case 103536)
Fix: Phase gives different status when unhiding floors with the same phase. (Case 99682)
Fix: Pcp 2.0 export had too many decimals under "Total height". (Case 103804)
Fix: Not possible to right click on the marked element after Batch sign, revisions, etc. (Case 100572)
Fix: Manual elements aren't saved when switching building. (Case 100315)
Fix: Issue with open PDF and syncing the file. (Case 105016)
Fix: IFC files are now visible in the model viewer when right-clicking on IFC and selecting "Reload IFC Files". (Case 88271)
Fix: Hide button is disabled from context menu. (Case 101271)
Fix: Fixed an issue where the "Unhide all" command was not reverting back the phases and elements in model view. (Case 103264)
Fix: Erection Sequence Number is seen now in the element id tab. (Case 103039)
Fix: Endcap reinforcement sync issues. (Case 101624)
Fix: Element ID show/hide + select is Misbehaving. (Case 101148)
Fix: Edit cast gave incorrect planned production date. (Case 101793)
Fix: Drawing Specification issues. (Case 101567)
Fix: Drawing specification is not shown correctly. (Case 102557)
Fix: Copy with Header in ID-grid doesnt work in some scenarios. (Case 102227)
Fix: CIM reference text shouldn't allow more than 12 characters in PM. (Case 101498)
Fix: Ax Export transport no was incorrect. (Case 105533)
Fix: Add element in Erection Planning makes PM Crash. (Case 105590)
Fix: "Element Status History" is now correctly logged when switching status. (Case 94357)