Release notes IMPACT for Project Manager 16.0.040 Q2/2022

Last modified by Adam Carlson on 2022/05/31 11:38

New

New: Publish should handle that the log file can have different extensions. (Case 119586)

New: Element color for rough planning. (Case 112028)

New: Change the Publish.log to Publish.JSON and add an internal element type. (Case 119307)

Fix

Fix: Update Panels doesn't work correctly. (Case 118295)

Fix: TB xml to erpbos Export - Ready for Production. (Case 119491)

Fix: Small issues with switching elements placement. (Case 119890)

Fix: Select one element with a shop drawing and one without and open dwg - will result in a crash. (Case 120385)

Fix: SBE Element Mark to XML - The dialog closes down when a location is chosen, it didn't do that in IMPACT 15. (Case 119152)

Fix: Resolved the issue where ERP export was generating an extra layer and volume for solid walls. (Case 119492)

Fix: Replace warning in PM. (Case 110956)

Fix: Publish should only do the check for the producibility log file for Formslab. (Case 119231)

Fix: Open PDF always open all PDFs. (Case 118012)

Fix: Lock Status on drawing. (Case 111155)

Fix: Item_2 removed from Element Mark export. (Case 118686)

Fix: IMPACT Publish was set as successful but no pdf was created. (Case 120188)

Fix: Hide options in status description not enabled. (Case 110662)

Fix: Fixed the issue where the element marks were not printed in numerical order. (Case 119241)

Fix: Filter issue in recycle bin for the column "Deleted by". (Case 109237)

Fix: Export as linked element marks count is incorrect. (Case 111386)

Fix: Element Quantities incorrect presentation with multiple phases. (Case 118914)

Fix: Drawing sorting. (Case 117419)

Fix: Delete elements from Project Manager missing information about when they were deleted and who deleted them. (Case 116522)

Fix: "Plot using layout information" is now creating pdf:s with the same page size as chosen in CAD. (Case 117491)