New

New: It is now possible to add Building, Floor, Phase, and Drawing Description to Cast Calendar reports. (Case 101662)
New: Changes to the Form Slab summary report, length of non orthogonal edges and new intervals for the holes. (Case 102726)
New: Changes to the Double wall summary type 2 report, fields for bounding box are for one shell connected to shell thickness added, new intervals for holes added and length of non orthogonal segments added. (Case 102727)
New: Added Item No 1 and Item No 2 to the Form Slab Summary and Double wall summary Type 2 reports. (Case 101160)
New: Add the new layouts from 3D drawings, floor plans, elevations and other drawing to the Table of Drawings. (Case 103874)

Fix

Fix: Wrong information in the reinforcement bending schedule report. (Case 103509)
Fix: where CIM in beams gave the wrong amount on reports. (Case 102751)
Fix: Incorrect sum of dynamic CIM when MTO is set to Unit length in the CAST IN MATERIAL SUMMARY report has both the fields for UNIT_LENGHT and SUM. (Case 103677)
Fix: Element production date is missing in Production Per Day report. (Case 103336)
Fix: Correct detailed element control report. (Case 105682)