Version 17.0.004 Q1/2023

Last modified by Strahinja Jovicevic on 2023/03/14 14:01

New

New: Add insulation volume to the Project Follow up report. (Case 124732)

New: New possibility to turn off colors in reports. (Case 124123)

New: Drawing revision added to the report type Planned Production, (Case 123229)

New: QR code can be added twice in the element label. (Case 124140)

New: Add a new field and a new selection for Alterations and Additions to the Detailed Hole Specification and Detailed Hole Specification summary. (Case 123306)

New: QR code can be added twice in the element label. (Case 124140)

New: New possibility to turn off colors in reports. (Case 124123)

New: New field "Cast status time" in Disorder issues and Rejected elements reports which shows the date and time when user changes the cast status from planned to produced. (Case 124506)

New: Drawing revision added to the report type Planned Production, (Case 123229)

New: Add insulation volume to the Project Follow up report. (Case 124732)

New: Add a new field and a new selection for Alterations and Additions to the Detailed Hole Specification and Detailed Hole Specification summary. (Case 123306)

Fix

Fix: The Reinforcement mesh mass is incorrect in the Project Follow up report. (Case 124731)

Fix: The Project Follow up report is not filling in the Delivery Date. (Case 124719)

Fix: The length of non orthogonal segments in the report type FormSlab summary had precision errors. (Case 123678)

Fix: an issue where reinforcement bar mesh did not get added to RC mesh mass in reports. (Case 123412)

Fix: a date conversion in for max date in table or drawings report. (Case 123963)