Status
Last modified by Linus Karlsson on 2022/01/20 13:41
Under status, you can create different statuses for the different stages of a drawing.
Figure 1: Status in Standard Admin
You can create as many drawing statuses as you like with different description. There are only three types of status in the system.
Status | Action taken |
Preliminary | The date will be filled in the attribute PRELIMINARY_DATE |
Building | The date will be removed from the attribute PRELIMINARY_DATE |
As-built | Revisions and the layer SP_L_REVISION will be erased if the command batch sign is started from IMPACT Precast Project Manager |
Tabel 1: Default drawing statuses
Figure 2: Status in drawing panel