Status

Last modified by Linus Karlsson on 2022/01/20 13:41

 

Under status, you can create different statuses for the different stages of a drawing. 

1523283558578-903.png

Figure 1: Status in Standard Admin

You can create as many drawing statuses as you like with different description. There are only three types of status in the system.

Status

Action taken

Preliminary

The date will be filled in the attribute PRELIMINARY_DATE

Building

The date will be removed from the attribute PRELIMINARY_DATE

As-built

Revisions and the layer SP_L_REVISION will be erased if the command batch sign is started from IMPACT Precast Project Manager

Tabel 1: Default drawing statuses

1523283894647-306.png

Figure 2: Status in drawing panel

Tags:
Copyright 2024 StruSoft AB
IMPACT Wiki