Version 17.0.003 Q4/2022
New
New: Add Building in Production Progress Report. (Case 122325)
New: Enhance Issues with section and design manager. (Case 121187)
New: The following fields are added to the "Detailed element report" (Nr. 61) TOTAL_REINFORCEMENT_MASS, TOTAL_CONCRETE_VOLUME, and TOTAL_INSULATION_VOLUME. (Case 120874)
Fix
Fix: Special case where the dates were not following the correct order when "grouped by" was used in IMPACT. (Case 122413)
Fix: Planned erection date was not on the same line as the other planned dates for the same element. (Case 122716)
Fix: Date Graph Format not changing to Week commencing Date after save. (Case 122418)
Fix: Unitechnik export from Transport. (Case 121874)
Fix: Wrong elements show up in Work Load. (Case 123287)
Fix: Element control parameters must follow check rules. (Case 122959)