AUTOCHECKPRODUCIBILITYSANDWICH
The variables below all work the same. Therefore this article covers all of them.
- AUTOCHECKPRODUCIBILITYSOLIDWALL
- AUTOCHECKPRODUCIBILITYINSULATEDWALL
- AUTOCHECKPRODUCIBILITYSOLIDSLAB
- AUTOCHECKPRODUCIBILITYPRESLAB
- AUTOCHECKPRODUCIBILITYDOUBLEWALL
- AUTOCHECKPRODUCIBILITYFORMSLAB
Note: AUTOEXPORTUNITECHNIKSOLIDWALL and all the similar variables described in the linked article must be set to 0 or not present in standard admin. If any of these variables are set to 1 then a producibility check will be run.
With this setting turned on IMPACT will do a producibility check automatically without creating a Unitechnik file on the following commands:
- All the MTO commands in the element tab except "Save Symbols"
- Generate shop drawing
- Batch generate
- Draw element
The file will be generated to the location setup in the library structure. The element doesn't have to be set as ready for production for the check to occur.
Example of the IMPACT default setting:
Variable | Type | Value |
---|---|---|
AUTOCHECKPRODUCIBILITYSANDWICH | 0 | 0 |
If desired, The producibility check must be run manually from the Base, Doublewall, or Formslab tab.
Example with a user default setting:
Variable | Type | Value |
---|---|---|
AUTOCHECKPRODUCIBILITYSANDWICH | 0 | 1 |
The functions that trigger the producibility check are shown below.
A GIF showing the procedure when MTO Reinforcement is run and the producibility check is run and a log created is shown below.